Location:Home > Products > Dehumidifier
25000 fixed & combined dehumidifier
Description
Using a combination of frozen type moisture eliminator and cellular wheel type moisture eliminator,the fixed and combined dehumidifier is applied to special painting operations in fixed place throughout the year.In summer, it makes frozen type moisture eliminator as center, cellular wheel as assistant.In spring and autumn, it combines frozen type moisture eliminator and cellular wheel type moisture eliminator.In winter,it uses cellular wheel type moisture eliminator.
Product Parameters sheet:
Model Parameters |
TZH-G-F-25RD |
TZH-G-F-25DR |
TZH-G-F-25RR |
TZH-G-F-25RRR |
||
Energy efficiency rating |
A |
B |
C |
D |
||
Processed airflow rate m3/h |
25000 |
|||||
excess pressure of air-outlet Pa |
≥1500 |
|||||
Power of main fan kW |
30或22 |
|||||
Refrigerating capacity kW |
≥500 |
|||||
Compressor(HP) |
2*70 |
2*90 |
2*70 |
2*70 |
||
Wheel size |
1520*200 |
|||||
Regeneration air flow rate m3/h |
6000 |
|||||
post heating mode |
subcooler |
electric heating |
subcooler |
subcooler |
||
heating mode in winter |
electric heating |
heat pump of main system |
||||
electric heating power kw |
160 |
160 |
160 |
0 |
||
wheel regeneration model |
electric heating |
heat pump |
heat pump |
heat pump |
||
power of regeneration system kW |
108 |
15 |
15 |
15 |
||
Inlet air condition |
-10~45℃/ RH60%~95% |
|||||
outlet air conditions |
In spring and Autumn: temperature≤25℃±3℃ RH≤45%;Summer: temperature≤25℃±3 ℃ RH≤45%;In winter: temperature≥25℃±3℃ RH≤45%; |
|||||
air outlet |
Fixed:750mm in diameter, with a switch valve, with the connector. (it can be customized according to user’s requirements) |
|||||
electric cabinet |
PLC control. Electric leakage protection + phase fault protection + over and under voltage protection, overload protection and electrical shunt protection, and is provided with a self-diagnostics system. Dust proof and moisture proof. |
|||||
control and display of temperature and humidity |
2*4 stage automatic unloading refrigeration + control of wheel regeneration temperature + cooler (or post heating) + winter heating. With outlet and inlet temperature and humidity display, refrigeration temperature display. |
|||||
Fault display |
System power failure / error phase / high and lower voltage failure / overload display |
|||||
Pressure display and protection |
Refrigerant high and low pressure display and protection. Voltage over-voltage and under-voltage protection. |
|||||
electric current display |
Each group of motors and electric heating current display. |
|||||
Air inlet filter |
Stainless steel frame, aluminum alloy material multi-layer structure of filtering net, accuracy is sub-middle effect, removable, 10 thousand times cleaning. |
|||||
Communication model(optional) |
Wired (or wireless) remote monitoring and messages warning |
|||||
The maximum operating power kW |
209 |
302 |
209 |
158 |
||
Installed power kW |
453 |
360 |
326 |
206 |
||
Chassis structure |
The unitary frame structure. Equipped with hanging holes, the main structure of the strength and stiffness can meet the requirement of hoisting. |
|||||
equipment weight kg |
Integral type |
8000 |
||||
outdoor unit of split type |
3000 |
|||||
Indoor unit of split type |
5500 |
|||||
overall dimension |
Integral type |
5000*2400*3300 |
||||
outdoor unit of split type |
4500*2200*2000 |
|||||
Indoor unit of split type |
4800*2400*2500 |
|||||
The energy consumption comparison of various forms of dehumidifier
|
TZH-G-F-25DD |
TZH-G-F-25RD |
TZH-G-F-25DR |
TZH-G-F-25RR |
TZH-G-F-25RRR |
Energy efficiency rating |
Traditional model |
A |
B |
C |
D |
Installed power kW |
453 |
453 |
360 |
326 |
206 |
The maximum operating power kW |
302 |
209 |
302 |
209 |
158 |
Power distribution capacity kw |
315 |
315 |
315 |
240 |
180 |
Annual average operating power kW |
181 |
127 |
121 |
93.3 |
78.3 |
Annual power consumption kwH |
622330 |
435631 |
416961 |
333520 |
269260 |
Energy consumption ratio |
100% |
70% |
67% |
50.3% |
43.2% |
Remarks:
1.The above data were gave according to the actual operation 332 days in 2012
2.Energy consumption data were measured in Shanghai area
3.It can be customized according to customer’s requirements. Specific configuration will be subject to technical specification.